Gruppe 3: Project documentation
WORKING PROCESS THROUGHOUT THE PROJECT:
Day 1 (Thursday afternoon):
-Planning of the concept
-Planning of the remaining days
Day 2 (Friday):
-Recording of various sounds around the school
-Storyboarding
-Distributing the scenes between each other
Day 3 (Tuesday):
-Video was done by Kevin over the weekend
-More sounds were recorded the day before during the afternoon
-Cutting the raw video and editing it to the final version
-Editing sounds and adding them into the video (everyone on their own)
Day 4 (Wednesday morning, Last Day):
-Polishing the last few details
-Assembling the 3 parts of the video together and making sure the sounds fit with the movie clip (!!!)
************************************************
DISTRIBUTION OF WORK:
Together
-planning the concept and the schedule throughout the whole project
-recording and collecting sounds
-discussions and criticism between each other during the editing of the videos on our own
-assembling the video together
Individually
-editing the video parts assigned
-modifying the sounds to fit the movie clip
Kevin
-recording the video
-uploading the videos onto the blog
Sarard
-writing the project concept
May
-documenting the project
************************************************
STORYBOARD:
(Note to self: The camera always stays at the one spot for a reason. The audience should concentrate on the sound more than the movie clip itself due to the fact that the sole reason we're doing the exercise is because of the sound itself.)
Scenes:
1. Kevin starts out of range of the camera and comes into the picture, closing in on the elevator door as he presses the button. After hearing some loud noises behind the closed doors, he realizes that something within the elevator had broken down. (Kevin)
****************************************
2. The protagonist enters a room full of machineries and starts to repair the electronics of the elevator, in hoping of making it work afterwards. (Sarard)
****************************************
3. Kevin returns to the first scene again and presses the button another time. This time, apparently, there was not much of a disastrous sound and the elevator made a recovery. The door then opens and Kevin steps in. (May)
Sarard
Anstatt offensichtliche Geräusche zur Veranschaulichung zu nutzen, veränderte ich die Sounds nach meinen Vorstellungen. Das Drehen an den Knöpfen und Hähnen bewirkt verschiedene Modulationen in Ableton Live. Mit der Automation von Gain, Pan, Reverb, verschiedenen Filtern und einem Stereo Tool versuche ich dem Hörer ein stimmiges Raumgefühl zu geben und die Sounds interessanter zu gestalten. Der „Motor“ des Liftes wird repräsentiert durch ein Holpern, welches durch stetige Verkürzung des Sampleloops langsam in einen Ton übergeht. Das Zischen des Hahnes erzeugte ich mit einem Reverb, Decaytime unendlich.
Kevin & May
Für unseren Teil wollten wir einen modernen Lift so darstellen, als ob er uralt und schwer ist. Nicht wie im Film modern und funktionstüchtig. Wir überlegten uns bereits bei der Aufnahme, was sich zum vertonen eignen würde. Das Geräusch der Hebebühne eines Lasters schien uns zum Beispiel sinnvoll für den Lift. Im Keller fanden wir Metallrohre, ein Metallgitter und eine Metallplatte. So hatten wir eine gute Ausgangslage für Wir experimentierten nicht nur in der Aufnahmeform, sondern auch in der Art der Handlung, wobei immer neue Sounds entstanden. Mit Sarard sprachen wir uns ab, so dass es einen nahtlosen Übergang zwischen den verschiedenen Räumen gab. So soll der Hörer die Wahrnehmung desselben Ortes gegeben werden.
Samples - Original
Sarard - Fertiges Sounddesign
Reaper Zip Folder:
Reaper_Lift_ist_kaputt